Typical warning signs
- Cracks, hollow layers or spalling in the covering
- Moisture spots on connections and bases
- Water accumulation after rain
- Significant wear in heavily used areas
What should be done first
The priority is always on tightness and substance protection. Visual topics follow afterwards so that the area is technically secure.
- Seal individual areas even though there is systemic damage
- Insufficient checking and preparation of the surface
- Only consider important peripheral areas at the end of the project
Renovation process in practice
In Mainz-Hechtsheim, the process starts with damage assessment and prioritization of the critical zones. The appropriate structure is then implemented in a reliable sequence.
If several types of areas are renovated in combination, coordinated detailed planning ensures a clean transition between the trades.
Frequently asked questions
When is a partial repair sufficient?
For local, clearly limited damage. In the case of systemic problems, a more comprehensive renovation usually makes sense.
How quickly should you react in Mainz-Hechtsheim?
As early as possible at the first warning signs so that consequential damage is limited.
What happens after the project is completed?
You will receive information on use, care and useful visual inspections for the future.