Typical warning signs
- Open edge zones or damaged connection areas
- Dark traces of moisture at transitions to walls or doors
- Prolonged standing water on partial areas
- First outbreaks in frequently visited areas
What should be done first
In practice, the technical cause should first be secured. Design and finishing touches come in the second step.
- Prioritize time pressure over technical order
- Lack of documentation of the shifts carried out
- Do not include care and control instructions in the handover
Renovation process in practice
The renovation process in Mainz is divided into initial check, technical definition, execution and controlled acceptance with care instructions.
In this way, the process remains transparent for the client and the area is prepared not only in the short term, but permanently.
Frequently asked questions
When is a partial repair sufficient?
For local, clearly limited damage. In the case of systemic problems, a more comprehensive renovation usually makes sense.
How quickly should you react in Mainz?
As early as possible at the first warning signs so that consequential damage is limited.
What happens after the project is completed?
You will receive information on use, care and useful visual inspections for the future.